The design is sound at its core and you can start building tomorrow, but three gaps in it will produce wrong stock or stuck orders and should be fixed in the doc first. None changes the structure; each is a one- or two-line addition.

**Fix before building**

1. **Stock can be restored twice for one failed order.** Steps 5 and 6 don't say that settling an order is conditional on it still being `PENDING`, and nothing says the reconciliation job runs on only one of the two instances.
   - Failing case: an order for 1 unit of SKU A is `PENDING` with `available = 0`. Both instances run the job at the same minute and both see the provider report a decline. Both mark it `FAILED` and both add 1 back, so `available` is 2 when it should be 1, and you oversell a unit.
   - Fix: settle with `UPDATE orders SET status = ... WHERE id = :id AND status = 'PENDING'`, and restore stock or queue the email only if that changed a row. Apply the same rule in steps 4 and 5.

2. **Reconciliation has no answer when the provider has never heard of the order.** Step 6 only settles as `PAID` or `FAILED` from the provider's charge status.
   - Failing case: an instance crashes after step 2 commits and before the charge call in step 3. The order is `PENDING`, stock is reserved, and the provider returns "not found". The order stays `PENDING` forever and the stock stays held, where it should become `FAILED` with stock restored.
   - Fix: treat "no charge found" as `FAILED` and restore the stock. The 2-minute age threshold is safely longer than the worst-case retry window of about 30 s, so say in the doc that the threshold must stay above that window.

3. **Two concurrent multi-item orders can deadlock.** Step 2 updates stock rows in cart order.
   - Failing case: order 1 has SKUs A then B, order 2 has B then A. Each locks its first row and waits for the other. Postgres aborts one and that customer gets a 500, where it should get a normal success or `409`.
   - Fix: reserve SKUs in sorted order.

**Decide and write down (can be settled in the first day or two)**

- **Where prices come from.** The data model has no price source, and the doc doesn't say the server computes `unit_price` and `total` itself. If they come from the client's cart, a customer can set their own price.
- **Idempotency key details.**
  - Scope the unique constraint to `(customer_id, idempotency_key)`.
  - Two simultaneous requests with the same key must be handled: the second hits the unique violation and should return the existing order, not a 500.
  - Decide what happens when a key is reused with a different cart; I'd reject it.
  - State that a retry after `FAILED` needs a new key.
- **What the client does after `202`.** There is no `GET /orders/{id}` or other way to learn the outcome.
- **Email after reconciliation.** Step 6 doesn't say an order settled as `PAID` by the job gets the confirmation email.
- **Missing columns and constraints.**
  - The provider's charge id on `orders`, which you need for refunds and support.
  - Primary keys on all three tables.
  - `CHECK (available >= 0)` on `stock`.

**Tests to add to the plan**

The current list covers the sequential paths well. Add:

- A crash between reserve and charge, which is gap 2.
- Two reconciliation runs on the same order, which is gap 1.
- Two simultaneous `POST`s with the same key.
- Two buyers racing for the last unit.
- A multi-item order where one item is out of stock, checking that no stock is left reserved.

**What is already right**

- The charge happens outside the database transaction.
- The order id is the provider's idempotency key.
- The reservation is a single conditional `UPDATE`.
- Email never fails the order.
- An alert fires on orders stuck in `PENDING`.

The design is also sized correctly for 2,000 orders a day and a team of four; I would not add anything heavier.

VERDICT: READY WITH CHANGES
